Team
AECOM Landscape Studio NYC
‘Rebuild by Design’ Meadowlands
Green Infrastructure (GI) Strategic Plan
The GI Strategic Plan aims to set a strong resilience foundation for the Meadowlands region and Hackensack River Watershed.
This project presents a framework for addressing storm resiliency through green infrastructure. These methods of adaptation and mitigation can strengthen resiliency of urbanized areas vulnerable to flooding.